Adani Dahanu Thermal Power Station

Adani - Dahanu Thermal Power Station (ADTPS), consisting of two units of 250 MW, is one of the best power generation plants in the country, which commenced its commercial operations in January 1996. Recognized with innumerable awards, this power plant is known for its distinctive features that set it apart from others in terms of technological innovation, superior performance, and continuous sustainability for a longer period. ADTPS is located around 120 km north of Mumbai along Mumbai-Ahmedabad rail line.

The plants utilise a mix of Indian coal and imported coal as fuel. The indigenous fuel is received from SECL (Korba) and imported from Indonesia.

Adani - Dahanu Thermal Power Station has implemented integrated management systems (IMS) in its processes and is certified for quality management, environment management, occupational health and safety assessment studies, social accountability management, information security management, energy management and accreditation for ADTPS coal & Ash testing laboratory.

  • The first power station in the country with two units of 250 MW.
  • Commercial operations started in January 1996.
  • Employs a blend of Indian coal and imported coal as its source of fuel.

 

Plant Performance:

Here is an insight into the year-on-year performance of the plant:

ADTPS Plant Performance
Parameters UoM FY 18-19* FY 19-20* FY 20-21* FY 21-22* FY 22-23*
PLF
%
82.58
76.22
73.20
76.21
79.88
Availability
%
94.89
91.33
98.07
90.75
95.82

Note* Due to low load demand, MSLDC instructs generation backing down of power plants based on Deviation Settlement Mechanism (DSM).

 

Recognitions:

ADTPS has received Copyright for three innovative works from Copyright Office of Government of India, New Delhi.

  • Reduction in Overhauling Time - Implementation of Work procedure has ensured considerable reduction in overhauling period to 15 days. Thereby saving Generation revenue equivalent to at least 10 to 15 days.
  • Energy Deviation Report - An effective tool for energy consumption monitoring and optimization. This helps operation personnel to utilize energy efficient equipment to cater economical generation.
  • Improvement of Coal Mill Performance by Auto Operation - Software developed by ADTPS team by studying the correlation between air and coal flow. This logic has helped to avoid undue variation in load and other process parameters even during very heavy rain.

 

Major Milestones:
  • Unit no. 1 was synchronized on 6th January 1995
  • Unit No. 2 was synchronized on 29th March 1995
  • Unit no. 1 commercial operation from 1st July 1995
  • Unit No. 2 commercial operation from 1st January 1996
  • The power station commercially commenced its operation in 1996
  • FGD Unit I and II commissioned in October 2007
  • World's First Power Plant to get ISO 50001: 2018, certification for Energy Management
  • ISO 9001: 2015 - Quality Management System
  • ISO 14001: 2015 - Environment Management System
  • ISO 45001: 2018 - Occupational Health and Safety Assessment Studies
  • SA 8000: 2014 - Social Accountability Management System
  • ISO 27001: 2013 - Information Security Management System
  • ISO 55000: 2014 – Asset Management System
  • ISO 22301: 2012 Business Continuity Management System
  • ISO 27031 :2011 ICT: Information & communication technology readiness for business continuity
  • ISO 26000:2010 SR: Social Responsibility assessment & compliance.
  • ISO / IEC 17025: 2005 - Accreditation for ADTPS coal & Ash testing laboratory by National Accreditation Board of Laboratory (NABL)
  • ISO 46001:2019 - Water Efficiency Management System.
  • Single Use Plastic Assessment Certificate
  • Zero Waste to Landfill certificate

 

Special Features:

Many features distinguish the Dahanu plant as India's one of the finest power generation plants. These include :

  • The CW Systems are equipped with concrete volute pumps to facilitate the smooth functioning of Sea water based once through condenser cooling water system.
  • Complete automatic control & monitoring of the three cylinders reheat condensing turbine, boiler and auxiliaries by Digital Distributed Control, Monitoring, and Information System (DDC-MIS) to maintain trouble free output.
  • Highly advanced Supervisory Control and Data Acquisition (SCADA) system for complete centralized control over transmission and distribution.

In a bid to ensure minimization of plant's adverse environmental impact, the ADTPS has installed:

  • A chimney of 275.3 Mtr height for proper emission/ dispersion of boiler exhaust
  • An Electronic Electrostatic Precipitator (ESP) of 99.9% efficiency to collect fly ash with In-house developed Ammonia dosing system to improve collection efficiency.
  • Four ambient air quality monitoring stations to measure PM10, PM2.5, SO2 and NOx.
  • Flue gas Desulphurization unit for removal of Sulphur di oxides.
  • Advanced online stack emission monitoring system.

 

Energy Conservation:

ADTPS has made remarkable achievements on parameters of average unit heat rate, Auxiliary power consumption (APC), Specific Oil Consumption & DM water consumption by consistently maintaining them lower than the national average for a generation unit of this size.

ADTPS has proactively adopted the following energy conservation measures...

  • Replacement of old HP module with refurbished module which has improved efficiency.
  • Installation of Variable Frequency Drive in Condensate Extraction Pumps, Coal Mill Seal Air Fans, PA Fan.
  • Vapor Absorption Air Conditioning systems.
  • Energy Efficient lighting systems.
  • Solar street lighting.
  • Corrocoating of CW Pumps & ACW Pumps.
  • Replacement of old IP module with new module which has improved efficiency.
  • Auxiliary power reduction of Boiler feed pump (BFP) through innovative approach - changing the gear ratio of hydraulic coupling.

The Energy Management Cell at ADTPS consists of qualified Energy Managers and Auditors, who continuously drive the energy conservation agenda with defined energy policy, procedures, and work instructions. Internal and external energy audits of various systems are conducted at regular intervals.

 

Environment Safeguards:

The organization's social responsibility towards the environment is evident in the adaptation of clean technology and stringently following the environmental safety guards:

To prevent Air Pollution

  • ESP of 99.9% efficiency for collection of fly ash from flue gases.
  • Online monitoring of emission levels of SO2, NOx, and TPM in Flue gas.
  • Four Ambient air quality monitoring Stations to measure PM10, PM2.5, SO2 and NOx along with one meteorological station for weather monitoring.
  • Ban on use of plastic bags inside the plant and colony. Cloth bags are provided at the colony gate.
  • Appointment of stewards for building to maintain cleanliness of their buildings and surrounding area and cleaning schedule for housekeeping of colony and plant surrounding area is being followed rigorously.
  • In house production of organic fertilizer is used for cultivation of vegetable and fruits
  • Plantation of varieties of flowers - 600 Nos with six varieties, Medicinal and Herbal Garden having forty-five species.
  • Total plantation of 2 Lakh of forest, fruit, and ornamental plants.

 

Corporate Social Responsibility:
  • Entrepreneurship program - Tailoring classes ongoing for rural community in Dahanu Taluka.
  • Integrated Tribal Development Projects.
  • Entrepreneurship program for empowering woman in Dahanu Talika under Swabhiman Center.
  • Development of Mother and childcare unit at Dahanu.
  • Mega Medical Camp at Dahanu for the local community.
Environmental Reports
Description Download
FORM-V Environmental Audit Report FY 2022-23
Environment Monitoring Reports for Apr-2023 - Sep-2023

 

Monthly Ash Utilization and Stock Position
Description Download
Ash Utilization and Stock Position - Oct-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Sep-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Aug-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Jul-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Jun-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - May-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Apr-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Mar-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Feb-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Jan-2023 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Dec-2022 Adani Dahanu Thermal Power Station
Ash Utilization and Stock Position - Nov-2022 Adani Dahanu Thermal Power Station